Top
Contact Us
English
繁體中文
About Us
Clean Room Introduction & Planning
Clean Room Construction Series
Clean Room Equipmet Series
Clean Room Supplies Series
Used Equipments
Clean Room Introduction & Planning
Specifications and Cleanliness for Clean Rooms
PIC/S Regulations
Regulations Table for Various Countries
Airflow Types for Clean Rooms
Flowchart for Clean Room Air Conditioning
Flowchart for Clean Room Planning
Requirements for Biological and Industrial Cleanliness
Table for Planning/Design of Clean Room
Cooling Load Estimation
Water and Power (Requirements)Planning Table
Cooling Load Estimation
Cooling Load Estimation
Customer Name:
Estimation Date:
37034 'LOAD
Construction Name:
Clean Room Construction
Estimator :
HCT
Construction Location:
******
(1)Interior Design Conditions:
71.6
℉(
22.0
℃)
(2)Outside Air Design Conditions:
95.0
℉(
35.0
℃)
DB
86.0
℉(
30.0
℃)WB
(3)Interior Pressure Difference:
1.25
Over mmAq
Interior Temperature:
89.6
℉ ( Non-Clean Room Area)
(4)Cleanliness Class: (0.5u)clas
****
(5)Floor Area:
****
m
2
Summer
Winter
(6)Ceiling Height:
****
M
Ceiling
With design value
With design value
(7)Clean Room Illuminance:
500
Lux
Height:
Humidity
Humidity
CFM
CFM
m
2
m
RH
Difference Value
Difference Value
RT
Circulating Air
OA
Floor Area
System ID:
Construction Location:
Class
H
±5%RH
DX1
DX2
0
0
0
0.0
Total
0
RT
(CFM)
(CFM)
(CFM)
RA
SA
OA
RT
0
0
0
0
kg/hr
RSHF
#REF!
Heating Air
Outside Air
Tmix( F)
#DIV/0!
KW
Humidity
#REF!
#REF!
Tmix( F)
D6-D5=
23.4
#DIV/0!
J7-D5=
18.0
Outside Air Temperature Difference
Interior Temperature Difference
D5-AC9=
27.0
KW
KW
Reference
Reference
CFM
Equipment
Air Conditioning Equipment
m
m
FT
2
FT
2
Tmix Temperature
Leaving Air Temperature
Air Change Times
Ventilation
Full Electricity
Heat Transfer Coefficient
(2)Vapor:
Electricity
X
Y
(1)Wall
(2)Wall
℉(DB)
℉(DB)
0
0.0
0.0
0
0
Customer Name:
Program Title:
'LOAD
Construction Name:
Clean Room Construction
Estimation Date:
37034
Construction Location:
******
Estimator :
HCT
Clean Room Illuminance:
500
Lux
RH:
±5%RH
(1)Interior Design Conditions:
71.6
℉(
22.0
℃)
Reference
Reference
Reference
(2)Outside Air Design Conditions:
95.0
℉(
35.0
℃)DB
FA Air Change Times
4
(HEPA
(FFU
(Drycoil
86.0
℉(
30.0
℃)WB
Outside Air in Winter
44.6
system:)
system:)
system:)
Interior Temperature:
89.6
℉ ( Non-Clean Room Area )
AHU
AHU
AHU
KW
(w)
kg/hr
BTUH
BTUH
CFM
CFM
CFM
b.
Interior Heat
Room Latent Heat
Pin
Heating Air
Outside Air
Room Sensible Heat
Total Room Heat
(1)Personnel:
(2)Electric Heat:
(3)Lighting:
(1)Personnel:
Floor Area
KW
Humidity Level
RSH
RTH
SA
SA
SA
2
0.0
#REF!
#REF!
#REF!
#REF!
0
#REF!
0
0.0
#REF!
#REF!
#REF!
#REF!
0
#REF!
0
(w)
Reference
Reference
Reference
Reference
Heating Air
Room Sensible Heat
CFM
CFM
Lighting
(40wx1)
(600)
(530)
(720)
(800)
(RT)
(RT)
Pin/RT
Outside Air F
Exhaust x1.1
Light Number
FFU
FFU
HEPA
RAET
Printing Sequence
#REF!
#REF!
#DIV/0!
0
0
0
1
1
1
1
1
8
#REF!
#REF!
0
0
0
1
1
1
1
1
Customer Name:
Estimation Date:
37034
Construction Name:
Clean Room Construction
Estimator :
HCT
Construction Location:
#REF!
System ID :
#REF!
Item No.
Estimation Description
(1)Interior Design Conditions:
71.6
℉(
22.0
℃)
=#REF!
±5%RH
(2)Outside Air Design Conditions:
95.0
℉(
35.0
℃)
DB
86.0
℉(
30.0
℃)WB
(3)Interior Pressure Difference:
1.25
Over mmAq
Interior Temperature:
89.6
℉ ( Non-Clean Room Area )
(4)Cleanliness Class: (0.5u)clas
=#REF!
Ventilation:
#REF!
Timers/hr
(5)Floor Area::
=#REF!
m
2
Air Supply:
#REF!
CFM
(6)Ceiling Height:
=#REF!
M
Exhaust:
#REF!
CFM
(7)Clean Room Illuminance:
500
LUX
Outside Air:
#REF!
CFM
A
Room Sensible Heat
a. Conducted Heat, Wall, Ceiling and Floor
(1)Wall:
#REF!
sqft
#REF!
*(
23.4
℉ )=
#REF!
BTUH
#REF!
sqft
#REF!
*(
18.0
℉ )=
#REF!
BTUH
(2)Floor:
#REF!
sqft
#REF!
*(
23.4
℉ )=
#REF!
BTUH
(3)Ceiling:
#REF!
sqft
#REF!
*(
23.4
℉ )=
#REF!
BTUH
Subtotal:
#REF!
BTUH
b. Interior Heat
(1)Personnel:
#REF!
人*
365
BTUH=
#REF!
BTUH
Electric Heat Percentage
(2)Electric Heat:
#REF!
KW*
3414
=
#REF!
BTUH
Oven: 70%
(3)Lighting:
#REF!
W*3.4*1.25=
#REF!
BTUH
Equipment(pcw,exh.): 25%
(4)Other Heat Sources:
0
BTUH
FFU: 100%
Subtotal:
#REF!
BTUH
A/H: 100%
Room Sensible Heat (RSH)
Total:
#REF!
BTUH*1.1=
#REF!
BTUH
B
Room Latent Heat
(1)Personnel:
#REF!
person*
385
BTUH=
#REF!
BTUH
(2)Vapor:
#REF!
Ls/Hr*3414=
#REF!
BTUH
(3)Other Heat Sources:
0
BTUH
Subtotal:
#REF!
BTUH
Room Latent Heat(RLH)
Total:
#REF!
BTUH*1.1=
#REF!
BTUH
C
Room Total Heat (RTH)=
A+B=
#REF!
BTUH
D
Outside Air Sensible Heat =
#REF!
CFM*(
23.4
)℉*
1.08
#REF!
BTUH
E
Outside Air Latent Heat =
#REF!
CFM*(
#REF!
)Gr/Lb*
0.68
#REF!
BTUH
F
Grand Total Heat (GTH)=
C+D+E
=
#REF!
BTUH=
#REF!
RT
G
Grand Sensible Heat Factor (GSHF)=
(A+D)/F=
#REF!
H
Room Sensible Heat Factor (RSHF)=
A/C=
#REF!
I
Room Heat Loss
Conducted Heat, Wall, Ceiling and Floor
(1)Wall:
#REF!
sqft
#REF!
*(
27.0
)=
#REF!
BTUH
#REF!
sqft
#REF!
*(
18
)=
#REF!
BTUH
(2)地板:
#REF!
sqft
#REF!
*(
27.0
)=
#REF!
BTUH
(3)Ceiling:
#REF!
sqft
#REF!
*(
27.0
)=
#REF!
BTUH
Subtotal:
#REF!
BTUH
Outside Air Heat Loss
(4)Outside Air Sensible Heat
#REF!
CFM (
27.0
) ℉ *
1.08
=
#REF!
BTUH
Heating Level
(1)+(2)+(3)+(4)=
#REF!
BTUH / 3.4 / 1000 =
#REF!
kw
J
Heating Level
Outside Air Humidity
#REF!
CFM * (
#REF!
) gr/lb * 4.45 / 7000 / 2.2 =
#REF!
kg/hr