|
Proprietor Name |
Construction Name |
ISO 14644 / FS 209 E |

|
Taiwan Semiconductor Manufacturing Company (Solar energy plant) |
Clean Room Equipment Construction |
Class 6 / 1000 |
Toppan Chunghwa Electronics |
Clean Room Equipment Construction |
Class 3 / 1 |
Gudeng Precision Industrial |
Clean Room Equipment Construction |
Class 4 / 10 |
ChipMOS Technologies |
Clean Room Equipment Construction |
Class 5 / 100 |
ASE Group |
Clean Room Equipment Construction |
Class 6 / 1000 |
ULTRA Chip |
Clean Room Equipment Construction |
Class 6 / 1000 |
eCERA ComTek |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
Wafer Works |
Clean Room Equipment Construction |
Class 5 / 100 |

|
Optimax |
Clean Room Equipment Construction |
Class 7 / 10000 |
Taiwan Nitto Optical |
Clean Room Equipment Construction |
Class 6 / 1000 |
Cando Corp. |
Clean Room Equipment Construction |
Class 5 / 100 |
Hannstar (Kaohsiung Plant) |
High-Temperature/Low-Humidity Clean Room Integrated Construction |
Class 7 / 10000 |
Chimei Optoelectronics (NIC Japan) |
Clean Room Equipment Construction |
Class 5 / 100 |
AUO Optoelectronics |
Clean Room Equipment Construction |
Class 5 / 100 |
JTouch Optoelectronics |
Clean Room Equipment Construction |
Class 6 / 1000 |
Merck Optoelectronics |
Clean Room Equipment Construction |
Class 6 / 1000 |
Chunghwa Picture Tubes |
Clean Room Equipment Construction |
Class 6 / 1000 |
He-Di Optoelectronics |
Clean Room Equipment Construction |
Class 6 / 1000 |
Zhi-He Optoelectronics |
Clean Room Equipment Construction |
Class 6 / 1000 |
Jing-Wei Optoelectronics |
Clean Room Equipment Construction |
Class 6 / 1000 |
Ding-Yi Co. |
Clean Room Equipment Construction |
Class 6 / 10000 |
DT Research |
Clean Room Equipment Construction |
Class 6 / 1000 |
KI Taiwan |
Clean Room Equipment Construction |
Class 6 / 1000 |
Jong Ching Brush |
Clean Room Equipment Construction |
Class 5 / 100 |
Jong Ching Brush |
Constant Temperature/Humidity Integrated Construction-Phase III |
Class 5 / 100 |
Edison Opto |
Constant Temperature/Humidity Clean Room Construction-Phase I |
Class 6 / 1000 |
Edison Opto |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase II |
Class 6 / 1000 |
Edison Opto |
Clean Room Construction-Phase III |
Class 6 / 1000 |
Edison Opto |
Clean Room Construction-Phase IV |
Class 7 / 10000 |
Edison Opto-Chong-Li Plant |
Clean Room Construction |
Class 7 / 10000 |
Lei-Da Precision |
Clean Room Construction |
Class 6 / 1000 |
Buwon Precision Sciences |
Clean Room Construction |
Class 6 / 1000 |
Lu-Mi Technology |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
Everlight Electronics |
8500M2 of Interior Partition |
NA |
Liminda Co. |
Clean Room Construction |
Class 7 / 10000 |

|
Subtron Technology |
Clean Room Equipment Construction |
Class 6 / 1000 |
HTC (Gue-San Plant) |
Clean Room Equipment Construction |
Class 5 / 100 |
ASUS Computer |
Clean Room Equipment Construction |
Class 6 / 1000 |
Jin Yun Electronics |
Clean Room Construction |
Class 7 / 10000 |
Tera Auto Tech Corporation |
Clean Room Equipment Construction |
Class 7 / 100000 |
Nan Ya Plastics (Shin-Gung Copper Foil Plant I, II, and III) |
Clean Room Equipment Construction |
Class 7 / 10000 |
Jiun Yo Co., Ltd. |
Clean Room Equipment Construction |
Class 6 / 1000 |
Formosa Thermometer & Barometer |
Clean Room Equipment Construction |
Class 5 / 100 |
Singapore ST Engineering |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
Green Point System |
Clean Room Construction |
Class 6 / 1000 |
Jess Link |
Clean Room Construction |
Class 7 / 10000 |
Taiwan Hitachi Chemical |
Clean Room Equipment Construction-Phase II |
Class 5 / 100 |
Taiwan Hitachi Chemical |
Clean Room Equipment Construction-Phase III |
Class 5 / 100 |
Taiwan Hitachi Chemical |
Clean Room Construction-Phase IV |
Class 5 / 100 |
Chroma ATE |
Clean Room Construction |
Class 6 / 1000 |
Ying Feng Enterprise |
Clean Room Construction |
Class 7 / 10000 |
Jing Jong Electronic |
Clean Room Construction |
Class 7 / 10000 |
Subtle Electronic |
Clean Room Construction |
Class 6 / 1000 |
San Yan Enterprise |
Clean Room Construction |
Class 6 / 1000 |
Ching Mei Paper |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 8 / 100000 |
Chao Long Motor Parts |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase I |
Class 7 / 10000 |
Chao Long Motor Parts |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase II |
Class 7 / 10000 |
Chao Long Motor Parts |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase III |
Class 7 / 10000 |
Chao Long Motor Parts |
Clean Room Integrated Construction-Phase IV |
Class 7 / 10000 |
Chao Long Motor Parts |
Constant Temperature/Humidity Clean Room Integrated Construction-1st Floor |
Class 7 / 10000 |
Chao Long Motor Parts |
Clean Room Construction-2nd Floor |
Class 7 / 10000 |
Trimech Technology |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 7 / 10000 |
Elite Material-Hsinchu Plant |
Clean Room Equipment Construction |
Class 7 / 10000 |
Elite Material-Guanyin Plant |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase I, II |
Class 7 / 10000 |
Elite Material-Guanyin Plant |
Clean Room Construction-1st, 2nd Floor |
Class 7 / 10000 |
Elite Material-Guanyin Plant |
Clean Room Construction-Plant 1 |
Class 7 / 10000 |
Elite Material-Guanyin Plant |
Clean Room Construction-Plant 2 |
Class 7 / 10000 |
He Guan Technology |
Constant Temperature /Low-Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
All In One Co. |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
Brazil Project |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 6 / 1000 |

|
Shang Lee Food |
Clean Room Equipment Construction |
Class 8 / 100000 |
Ho Shih Tsao Foods |
Clean Room Equipment Construction |
Class 8 / 100000 |
King Car Group |
Clean Room Equipment Construction |
Class 8 / 100000 |
Cargill |
Clean Room Equipment Construction |
NA |
Sings Kout Trading |
Clean Room Construction |
Class 7 / 10000 |
Gold Nano Tech |
Clean Room Construction |
Class 7 / 10000 |
Taiwan Textile Research Institute |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 8 / 100000 |
Lidye Chemical |
Clean Room Integrated Construction |
Class 7 / 10000 |
Taiwan Tobacco & Liquor -Fengyuan Cigarette Plant |
Air Pollution PreventionControl Construction |
NA |
Double Bond Chemical |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 7 / 10000 |

|
Adimmune Corporation |
PIC/S Clean Room Equipment Construction |
Class 5 / 100 |
Trida Co. |
Clean Room Integrated Construction |
Class 7 / 10000 |
Reber Genetics |
Clean Room Equipment Construction |
NA |
Shining World Health Care |
Clean Room Integrated Construction |
Class 7 / 10000 |
Top Surgical Taiwan |
Clean Room Equipment Construction |
Class 8 / 100000 |
Sunway Biotech |
Clean Room Construction |
Class 6 / 1000 |
Body Organ Biomedical |
Constant Temperature/Humidity Clean Room Integrated Construction-Phase I |
Class 6 / 1000 |
Body Organ Biomedical |
Clean Room Equipment Construction-Phase II |
Class 6 / 1000 |
Tatung Biomedical |
Clean Room Integrated Construction |
Class 6 / 1000 |
ACHB Enterprise |
Clean Room Construction |
Class 7 / 10000 |
Imperial Crown Biotechnology |
Clean Room Construction |
Class 7 / 10000 |
Rossmax International |
Clean Room Construction |
Class 7 / 10000 |
Shang Ding Enterprise |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 7 / 10000 |
Trimar International-Douliu Plant |
Clean Room Equipment Construction |
Class 8 / 100000 |
Trimar International-Hsinchu Plant |
Clean Room Equipment Construction |
Class 8 / 100000 |
Trimar International-Danshui Plant |
Clean Room Equipment Construction |
Class 8 / 100000 |
Taiwan Orchid Professionals |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 5 / 100 |
Long De Pharmaceutics |
PIC/S Constant Temperature /Humidity Semi-finished Product Clean Room Construction |
Class 8 / 100000 |
Agriculture Biotechnology Research Center/Academia Sinica |
Clean Room Equipment |
Class 7 / 10000 |
K-Jump Health |
Constant Temperature/Humidity Clean Room Integrated Construction |
Class 7 / 10000 |
K-Jump Health |
Constant Temperature /Low-Humidity Clean Room Integrated Construction |
Class 7 / 10000 |
Broadmaster Biotech |
Clean Room Equipment |
NA |
Fu De Sheng |
Clean Room Construction |
Class 7 / 10000 |
Synmosa Biopharma |
PIC/S Constant Temperature /Humidity Sampling Clean Room Construction |
Class 7 / 10000 |
Synmosa Biopharma |
PIC/S Constant Temperature /Humidity Semi-manufactured Product Clean Room Construction |
Class 7 / 10000 |
Synmosa Biopharma |
PIC/S Constant Temperature /Humidity Semi-finished Product Clean Room Construction |
Class 7 / 10000 |
Pharmastar |
PIC/S Constant Temperature /Low-Humidity Packing Clean Room Construction |
Class 8 / 100000 |

|
Auto Tech |
Clean Room Equipment Construction |
Class 8 / 100000 |
CSUN MFG. (Optoelectronics Dept.) |
Clean Room Equipment Construction |
Class 6 / 1000 |
Long-Light |
Clean Room Equipment Construction |
Class 6 / 1000 |
Manz AG |
Clean Room Equipment Construction |
Class 6 / 1000 |
Tianjin Technology (Singapore) |
Clean Room Equipment Construction |
Class 6 / 1000 |
Taiwan Hirata |
Clean Room Equipment Construction |
Class 7 / 10000 |
Mirle Automation (Innolux) |
Clean Room Equipment Construction |
Class 6 / 1000 |
Kenmec Mechanical Engineering |
Clean Room Equipment Construction |
Class 7 / 10000 |
Sinom |
Clean Room Construction |
Class 7 / 10000 |
Swift Rich Technology |
Clean Room Construction |
Class 7 / 10000 |

|
Minghsin University of Science and Technology |
Clean Room Construction |
Class 7 / 10000 |
National Yunlin University of Science and Technology |
Clean Room Construction |
Class 6 / 1000 |
National Tsing Hua University |
Clean Room Construction |
Class 6 / 1000 |
Taipei Medical University-Biology Laboratory |
Clean Room Equipment Construction |
Class 6 / 1000 |
Kainan University |
Clean Room Construction |
Class 7 / 10000 |
Ming Chi University of Technology |
Constant Temperature /Low-Humidity Clean Room Integrated Construction |
Class 8 / 100000 |
Chung-Shan Institute-W33 Building (Optoelectronics Dept.) |
Constant Temperature /Humidity Clean Room Integrated Construction |
Class 6 / 1000 |
National Chiao Tung University |
Clean Room Construction |
Class 6 / 1000 |
National Central University |
Clean Room Construction |
Class 6 / 1000 |
Academia Sinica |
Clean Room Construction |
Class 8 / 100000 |
Industrial Technology Research Institute |
Clean Room Construction |
Class 6 / 1000 |
Chang Gung Hospital (Keelung branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Chang Gung Hospital (Linkou branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Chang Gung Hospital (Chiayi branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Chang Gung Hospital (Kaohsiung branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Veterans General Hospital (Kaohsiung branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Wan Fang Hospital |
Animal Laboratory Equipment |
Class 8 / 100000 |
Tung’s Changhwa MetroHarbor Hospital |
Clean Room Equipment Construction |
Class 6 / 1000 |
Mackay Hospital (Danshui branch) |
Animal Laboratory Equipment |
Class 8 / 100000 |
Chang Sheng (Cherng Shen Union) Dental |
Operation Room |
Class 6 / 1000 |
Cosmed Dental |
Clean Room Equipment Construction |
Class 6 / 1000 |
Tai Ho Dental |
Clean Room Equipment Construction |
Class 6 / 1000 |